Tasks Tab Field Descriptions

Summary

The Tasks tab displays all tasks associated with the project in a grid format for quick viewing and editing. Project tasks are initially populated based on default settings and can be modified for each project, or adjusted globally in the Administration Section.

You can also use the Change Task Status to change task status.

Window

Project View - Tasks Tab

Field Descriptions

The following table lists field descriptions.

Section/Field

Description

Seq. ID

User identified numerical input determining a hierarchical order of task importance

Task

Description of a work flow process, such as Cutting, Assembly, Packaging

Employee

Assigned employee responsible for the task

Tracking Level

Level for tracking a task, by Project, Plan or Lot

Association

Project, Plan, or Lot

Estimated Start

Enter the estimated date to start the task

Start

Enter the actual date the task was started. All task date changes are automatically recorded on the History tab. See History Tab

Completed

Enter the actual date the task was completed. All task date changes are automatically recorded on the History tab. See History Tab

Estimated Man Hours

Estimate of the number of man hours to complete a specific task

Actual Man Hours

Enter the actual number of man hours to complete a specific task

LeadDays

Number of days required to schedule and complete a specific task

Note

Notes to communicate to other employees about a project task

Order

Order number

Delivery

Delivery information

Accessing

1.  In the Project List window, select a project.

2.  In the Project View window, select Project Info.

3.  Select Tasks Tab.

Tasks Tab Functionality

Grouping by column

With many plans and lots in a project, each with their own statuses, the Tasks tab may contain a lot of information. Grouping the information by column headers can help focus on critical information.

  • Group by Association places all of the tasks for a given item (Project level, individual Plans or individual Lots) together.

  • Group by Task places all the same task records for each item together.

  • In addition to the grouping, columns are sorted using a multi-column sort.

  • Referencing the screen below, after grouping by the Task column:

    1. Click Seq ID column to arrange all tasks in sequence order.

    1. While pressing Shift , click on Association column to sort items in that column alphabetically.

      • Up to three columns can be used in a multi-column sort.

Manually Adding a Task

  • You can manually add tasks that are not required and, therefore, not automatically added to projects; one example is Field Repair.

  • If any task (at any level) is repeated in a given project, another instance of the task can be manually added:

    • From the Change Status dialog

    • From inside the project on the Task tab, by right-clicking and selecting Add Item

Rebuild Tasks from Defaults function

To update tasks on existing projects to match new tasks and tracking level edits in the Admin > Task/Status tab:

  • Rebuild Tasks from Defaults function can be used to quickly make the update.

  • This function replaces all existing tasks with the current default tasks. All existing task data will be permanently lost. The following warning displays:

Convert Tasks function

Single Delivery Projects

  • Some small projects may require only one delivery; typically, these projects will not use the Deliveries tab > Lots feature.

  • For these projects, all tasks can be converted to project level so that lots do not need to be created to display Lot Level tasks.

  • The Convert Tasks (to Project Level) button is available in any project that does not already have Lots or more than one plan.

    • Selecting this button converts all existing tasks to project-level and adds all current lot-level tasks as project-level tasks.