The Components, Miscellaneous, Sets, Plans/Elevations and Deliveries icons interact to represent all items within the selected project
Access the project in view or edit mode to display the Project Information specifics.
Quantity relationships are most easily explained by
working backwards.
Quantity Relationships
Table
Term
|
Definition
|
Comments
|
Lot Multiplier
|
The number of open (production ready)
lots referencing the plan/elevation.
|
This value is located at the end of
the elevation label for Plans/Elevations (P/E).
|
P/E Batch Quantity
|
Lot Multiplier * Quantity in P/E
|
The Elevation A Lot Multiplier is
3.
T06 Quantity in P/E is 2.
T05 Quantity in P/E is 1.
T06 P/E Batch Quantity is 6.
T05 P/E Batch Quantity is 3.
|
Set Multiplier
|
Sum of all P/E Batch Quantities
|
Sets can be referenced on multiple
plan/elevations. Each P/E applies the Lot multiplier to the quantity of each Set in the P/E to determine the P/E Batch Quantity.
If Hip A is in P/E 1/A twice and P/E 1/A
is referenced by three lots then the Sets Multiplier for Hip A
is 6.
|
Set Batch Quantity
|
Set Multiplier * Quantity in Set
|
Calculated in the same way as the
P/E Batch Quantity. Each component has a value. |
Misc Quantity
|
Sum of all P/E Batch Quantities
|
Calculated in the same way as
the Set Multiplier
|
Component Quantity
|
Sum of all P/E Batch Quantities +
Sum of all Sets Batch Quantities
|
The total number of times the component
is referenced in the project.
Quantities on the Components tab are used for Batching by Component Groups
|